Actions
Defect #2844
closedForm projection allows edit contract controlled by time slices
Status:
Rejected
Priority:
Normal
Assignee:
Ondrej Husník
Category:
Frontend
Target version:
-
Start date:
05/31/2021
Due date:
% Done:
0%
Estimated time:
Description
Form projection allows edit contract attributes (basic attributes and eavs) controlled by time slices. After editing the form projection is all changed saved and only manual resave or reconciliation bring back to original status.
Afftected version > 10.6.x (tested also on current 11 version)
Files
Related issues
Updated by Ondrej Husník over 3 years ago
- Status changed from New to In Progress
- Assignee changed from Radek Tomiška to Ondrej Husník
Updated by Ondrej Husník over 3 years ago
- Status changed from In Progress to Needs feedback
- Assignee changed from Ondrej Husník to Ondřej Kopr
What exact version did you test that with? This has been solved in the ticket #2771. I also tested it at current development and it works properly IMO.
Updated by Ondrej Husník over 3 years ago
I'm sorry I missed the information about testing in version 10.6. This #2771 fix was introduced in the version 11.0. So since then it should work properly.
Updated by Ondřej Kopr over 3 years ago
- Status changed from Needs feedback to Rejected
- Assignee changed from Ondřej Kopr to Ondrej Husník
Aaa. Thanks for update with already fixed issue. I reject the obsolete ticket.
Updated by Radek Tomiška over 3 years ago
- Related to Defect #2771: Contracts controlled by time slices shouldn't be updated through form projection added
Actions