Project

General

Profile

Actions

Task #1283

closed

Include AD connector in build

Added by Peter Štrunc about 6 years ago. Updated about 6 years ago.

Status:
Closed
Priority:
Normal
Assignee:
Ondřej Kopr
Category:
Connectors
Target version:
Start date:
10/02/2018
Due date:
% Done:

100%

Estimated time:
Owner:

Description

Add adbundle connector v1.3.4.25 to build of czechidm-app.

Actions #1

Updated by Peter Štrunc about 6 years ago

  • Description updated (diff)
Actions #2

Updated by Vít Švanda about 6 years ago

  • Assignee changed from Vít Švanda to Ondřej Kopr
Actions #3

Updated by Ondřej Kopr about 6 years ago

AD connector isn't still deployed in public repository on nexus. This must be done before will be the connector added into product.

Actions #4

Updated by Ondřej Kopr about 6 years ago

  • Assignee changed from Ondřej Kopr to Peter Štrunc
  • Target version deleted (Morganite (9.2.0))

Please add AD connector into public repository. Or probably better and quicker solution. Add it as dependency into projspec module

Actions #5

Updated by Peter Štrunc about 6 years ago

  • Assignee changed from Peter Štrunc to Ondřej Kopr

Re-pushed tag 1.3.4.25 with included release management for maven-public-releases. Uploaded version 1.3.4.25 to https://nexus.bcvsolutions.eu/#browse/browse:maven-public-releases

Actions #6

Updated by Ondřej Kopr about 6 years ago

  • Status changed from New to In Progress
Actions #7

Updated by Ondřej Kopr about 6 years ago

  • Status changed from In Progress to Needs feedback
  • Assignee changed from Ondřej Kopr to Vít Švanda
  • Target version set to Morganite (9.2.0)
  • % Done changed from 0 to 90

Done, AD connector was added into parent. Beware, if you had ad connector downloaded fron another repository with same version is required clean local repository manually otherwise connector will not be downloaded.

commit: https://github.com/bcvsolutions/CzechIdMng/commit/430618eae33caebba464570afeecf70c057c9fb1 (branch develop)

Actions #8

Updated by Radek Tomiška about 6 years ago

  • Status changed from Needs feedback to Resolved
  • Assignee changed from Vít Švanda to Ondřej Kopr
  • % Done changed from 90 to 100

I did test - connector is available for the target system.

Actions #9

Updated by Ondřej Kopr about 6 years ago

  • Status changed from Resolved to Closed
Actions

Also available in: Atom PDF