Malformed progress bar

Added by Filip Měšťánek over 7 years ago. Updated over 5 years ago.

Status:
Closed
Priority:
Low
Assignee:
Radek Tomiška
Category:
Frontend
Target version:
Start date:
05/31/2017
Due date:
% Done:

100%

Estimated time:
Affected versions:
Owner:

Description

The progress bar shows the progress incorrectly. This happened when I was cancelling provisioning operations, switched to a different tab and then switched back.


Files

progress_bar.png (10.7 KB) progress_bar.png Filip Měšťánek, 05/31/2017 03:13 PM
loadingBar.png (15.8 KB) loadingBar.png Filip Měšťánek, 07/17/2017 03:17 PM
Actions #1

Updated by Radek Tomiška over 7 years ago

  • Target version set to Diamond (7.4.0)
Actions #2

Updated by Radek Tomiška over 7 years ago

  • Assignee changed from Radek Tomiška to Filip Měšťánek

I am not able to reproduce this issue, i need some additional information about browser and version.

Actions #3

Updated by Filip Měšťánek over 7 years ago

  • Assignee changed from Filip Měšťánek to Radek Tomiška

How to reproduce:

Have a system with 100 operations in provisioning queue. Select them all and press cancel operation. Now immediately switch to some other tab. Wait a few seconds (~15) and switch back - the progress bar will try to slowly catch up.

But now it looks better than before. The catching up takes only cca 1 second which was significantly slower in the past. But it has a very low priority. I am using chrome 59.0.3071.115 64-bit.

Actions #4

Updated by Filip Měšťánek over 7 years ago

Ok, so the effect is bigger, the longer the operation takes. Today, I was able to get this. Each cancel took like ~3s

Actions #5

Updated by Vít Švanda about 7 years ago

  • Target version changed from Diamond (7.4.0) to Emerald (7.5.0)
Actions #6

Updated by Radek Tomiška about 7 years ago

  • Target version deleted (Emerald (7.5.0))
Actions #7

Updated by Radek Tomiška over 5 years ago

  • Status changed from New to Needs feedback
  • Assignee changed from Radek Tomiška to Ondřej Kopr
  • Target version set to Rhyolite (9.7.0)
  • % Done changed from 0 to 90

I moved label with current progress below progress bar to prevent showing the progress bar incorrectly.

Commit:
https://github.com/bcvsolutions/CzechIdMng/commit/88099bc29a23434122960cddfe291efdfba30adf

Could you do a feedback, please?

Actions #8

Updated by Radek Tomiška over 5 years ago

  • Target version changed from Rhyolite (9.7.0) to Quartz (9.6.4)
Actions #9

Updated by Ondřej Kopr over 5 years ago

  • Status changed from Needs feedback to Resolved
  • Assignee changed from Ondřej Kopr to Radek Tomiška
  • % Done changed from 90 to 100

Cancel operations is done by bulk action and the progress bar on this feature works well. Thank you for your gui fixes.

Actions #10

Updated by Radek Tomiška over 5 years ago

  • Status changed from Resolved to Closed
Actions